Annual Report 2015

ru

Suburban passenger transportation via Russian Railways infrastructure

Suburban passenger turnover via Russian Railways infrastructure declined 5.2% to 30.9 bln pass. km in 2015 compared with 2014.

Suburban transportation carried 922.5 mln passengers in 2015, or 4.6% less than in 2014. Paying passengers made up 71.6% of the passenger structure, federal benefit recipients — 7.9%, regional benefit recipients — 9.3% and other categories — 11.2%. The number of paying passengers decreased by 5.4% compared with 2014.

Suburban passenger turnover by category, bln pass. km

Number of suburban traffic passengers transported via Russian Railways infrastructure, by category, mln passengers

Structure and performance results of the suburban passenger service system

At present, services are provided by 25 suburban passenger companies (SPC) that were established with the participation of Russian Railways, regional executive authorities, private investors as well as Aeroexpress, Interregional Passenger Company and Russian Railways (as represented by the High-Speed Transportation Directorate — branch of Russian Railways).

Russian Railways has a more than 50% stake in the charter capital of 19 suburban companies.

Suburban passenger companies concluded 92 contracts for public transportation services with 72 constituent entities of the Russian Federation in 2015.

Based on the 2015 results, 22 SPC were operating in the black with net profit of RUB 4,840.0 mln. Three SPC (North Caucasus SPC, Zabaikalskaya SPC and Kuban Express-Suburb) had combined losses of RUB 504.7 mln.

Performance results of SPC in 2015,RUB mln
No. SPC Net profit in 2015
1 Northern SPC 3.0
2 Chernozemye SPC 412.8
3 North Caucasus SPC –186.7
4 Zabaikalskaya SPC –273.9
5 Primorye Express 22.5
6 Baikal SPC 46.3
7 Sverdlovsk Suburban Company 160.6
8 Bashkortostan SPC 210.4
9 Kaliningrad SPC 0.8
10 Volgo-Vyatskaya SPC 69.2
11 Saratov SPC 33.0
12 Sodruzhestvo 0.5
13 Kuzbass Suburb 7.1
14 Samara SPC 83.9
15 Kuban Express-Suburb –44.0
16 Sakhalin PC 9.6
17 Perm Suburban Company 6.5
18 Volgogradtransprigorod 4.8
19 Krasprigorod 2.9
20 Altai-Suburb 0.2
21 Express-Suburb 36.3
22 Omsk-Suburb 1.6
23 North-West SPC 845.6
24 Moscow-Tver SPC 441.0
25 Central SPC 2,441.4
Total 4,435.4
including for profitable SPC 4,840.0
for unprofitable SPC –504.7

Compensation for shortfalls in income of carriers by constituent entities of the Russian Federation

Ensuring that Russian suburban transportation reaches the break-even point is one of the main objectives in the reform of the suburban sector. The break-even operation model cannot be built without the involvement of the constituent entities of the Russian Federation that regulate tariffs on suburban transportation. In this regard, only full compensation by the regions for the shortfall in income from government tariff regulation will help ensure that suburban transportation breaks even.

Given the preferential tariff rate in 2015 for the infrastructure services of suburban railway transportation, the demand of suburban carriers for subsidies to compensate for shortfalls in income arising as a result of the government regulation of tariffs amounted to RUB 12 bln. Subsidies were provided to compensate for shortfalls in income from the government regulation of tariffs in the amount of RUB 9.4 bln, which compensated for 56% of this demand. The subsidies received from regional budgets to compensate for shortfalls in income in 2015 amounted to RUB 9.5 bln.

The deficit in subsidies from the regions amounted to RUB 2.8 bln in 2015. Thirty-seven regions fully compensated for their shortfalls in income in 2015. Transportation is provided on a self-sustaining basis under preferential infrastructure conditions in five regions (Moscow, the Moscow Region, St Petersburg, the Leningrad Region and Astrakhan Region).

At the same time, in twelve regions compensation for the shortfall in the income of carriers amounted to less than 50%. Subsidies to compensate for shortfalls in income by suburban companies were not provided at all in three regions.

Compensation for shortfalls in income of carriers by constituent entities of the Russian Federation
Compensation level by constituent entities of the Russian Federation Number of constituent entities of the Russian Federation
2011 2012 2013 2014 2015
No compensation required 6 5 5 4 5
100% compensation 12 17 9 13 37
> 80% compensation 8 6 10 9 9
50–80%compensation 11 9 15 20 6
< 50% compensation 31 32 31 22 12
Not provided 5 4 3 5 3
Transportation stopped 1
Total 73

Renovation of rolling stock fleet

160 railcars Supplied by the High-Speed
Transportation Directorate
70 railcars supplied by the Central Railcar
Rolling Stock Directorate

Passenger rolling stock is regularly renovated to develop and improve suburban passenger transportation, enhance the quality of services provided as well as improve the technical condition of railcar rolling stock.

The Central Railcar Rolling Stock Directorate supplied 70 railcars valued at RUB 2.7 bln in 2015. A total of RUB 0.5 bln was spent on the rolling stock modernisation programme.

The High-Speed Transportation Directorate supplied 160 railcars (valued at RUB 18.9 bln) in 2015 and spent RUB 0.2 bln on the rolling stock modernisation programme.

Results of work to establish multimodal hubs

The Company implemented a number of projects in 2015 as part of work to establish multimodal hubs:

  • Establishing Lastochka (Desiro RUS) train traffic on the following routes: Moscow-Kryukovo-Tver, St Petersburg-Volkhovstroy, St Petersburg-Tosno, Yekaterinburg-Nizhny Tagil and Yekaterinburg-Kamenk-Uralsky. Passenger traffic will be further increased by the completion of construction on a fourth mainline on the Moscow-Tver section that will significantly reduce the amount of downtime for repairs, which in 2015 resulted in changes to train routes on this section and the cancellation of 7,727 trains.
  • The Company continued developing the Urban Commuter Train project currently under way in Krasnoyarsk, Kaliningrad, Ufa and a number of other cities.
  • Combined ‘train + bus’ routes were set up in the Gorky Railway operating domain in 2015 on the following routes: Nizhny Novgorod-Syava, Nizhny Novgorod-Vakhtan, Nizhny Novgorod-Tonshayevo (including transfer at Shakhunya station) and Nizhny Novgorod-Sharanga (transfer at Uren station). More than 2,000 passengers utilised this service over the period from September to December. Similar projects are to be launched on the operating domain of Bashkortostan SPC on the Ufa-Tuymazy-Yfa section with transfer at Kandry station and on the operating domain of Krasprigorod on the Ilanskaya-Reshoty section.

Reconstruction and development of the Moscow Little Ring Railway

The project to rebuild and develop the Moscow Little Ring Railway will significantly reduce transportation congestion in Moscow and enable urban rail transportation to transition to a whole new level of passenger service.

This project will result in new economic growth points emerging in Moscow and the creation of more than 10,400 modern jobs, including approximately 4,000 jobs in the passenger transportation sector. The electrification of the Moscow Little Ring Railway will significantly improve the environmental situation in the city and enhance the attractiveness of adjacent areas.

The development of the Moscow Little Ring Railway involves electrifying the ring railway with the construction of two new traction substations, the reconstruction of three existing traction substations, the construction of a 38-km third mainline as well as the construction and reconstruction of new engineering structures. A total of 31 stops will be built on the Moscow Little Ring Railway, including 19 major transportation hubs (TH): 12 with transfer to the metro system and six with transfer to radial railways.

Starting in 2016, Moscow Railways will carry more than 250 mln passengers each year on 100 electric train pairs per day with intervals of less than 5 minutes at rush hour.

Russian Railways has currently set up a working group in charge of preparing measures to ensure that the Moscow Little Ring Railway launches transportation services for the public starting in September 2016.